engine:sync:addrepositoryonmovedate
This is an old revision of the document!
−Table of Contents
AddRepositoryOnMoveDate
Add Repository based upon the value of the Next Move Date.
Phase
This instruction is used by the TapeTrack Synchronization Engine.
Special Considerations
If a matching entry is found for AddRepositoryOnMoveDate the AddRepositoryOnWriteTime (if any) will not be checked.
Syntax
AddRepositoryOnMoveDate(currentrepository, range, target);
string currentrepository;
string range;
string target;
currentrepository | Current Repository Filter. |
range | Range of Move Dates. |
range | Target Repository value. |
Example
Move Volumes to RACK if their Move Date is today to 10 days from today.
1 2 3 |
# #Move Volumes to RACK if their Move Date is today to 10 days from today. AddRepositoryOnMoveDate("*", "*:*+10", "RACK"); |
engine/sync/addrepositoryonmovedate.1539907982.txt.gz · Last modified: 2025/01/21 22:07 (external edit)