engine:sync:addrepositoryonmovedate
This is an old revision of the document!
Table of Contents
AddRepositoryOnMoveDate
Add Repository based upon the value of the Next Move Date.
Phase
This instruction is used by the TapeTrack Synchronization Engine.
Special Considerations
If a matching entry is found for AddRepositoryOnMoveDate the AddRepositoryOnWriteTime (if any) will not be checked.
Syntax
AddRepositoryOnMoveDate(current_repository, range, target);
string current_repository;
string range;
string target;
current_repository | Current Repository Filter. |
range | Range of Move Dates. |
range | Target Repository value. |
Example
Move Volumes to RACK if their Move Date is today to 10 days from today.
# # Move Volumes to RACK if their Move Date is today to 10 days from today. AddRepositoryOnMoveDate("*", "*:*+10", "RACK");
engine/sync/addrepositoryonmovedate.1539908058.txt.gz · Last modified: 2025/01/21 22:07 (external edit)