TapeTrack Documentation

Because there is more to tape management than you ever realized

User Tools

Site Tools


planning:introduction

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

planning:introduction [2019/10/16 21:59] – [Obtaining Consensus] Scott Cunliffeplanning:introduction [2025/01/21 22:07] (current) – external edit 127.0.0.1
Line 65: Line 65:
   * The level of integration and automation that is implemented.   * The level of integration and automation that is implemented.
   * Who is responsible for supporting TapeTrack.   * Who is responsible for supporting TapeTrack.
-  *-What level of alerting is enabled within TapeTrack.+  * What level of alerting is enabled within TapeTrack.
  
 <note tip>Create a document that outlines what you will setup and deploy TapeTrack, ensure each stake-holder receives a copy, and ask for feedback before moving towards implementation.</note> <note tip>Create a document that outlines what you will setup and deploy TapeTrack, ensure each stake-holder receives a copy, and ask for feedback before moving towards implementation.</note>
Line 98: Line 98:
 These objections can include: These objections can include:
  
-  Why did we have to change from our old system? +  Why did we have to change from our old system? 
-  Why is maintaining the old system no longer part of my duties? +  Why is maintaining the old system no longer part of my duties? 
-  I did not attend the training and I don't know how the system works. +  I did not attend the training and I don't know how the system works. 
-  The system is not the same as our old system. +  The system is not the same as our old system. 
-  Why am I getting messages notifying me that I have made a mistake? +  Why am I getting messages notifying me that I have made a mistake? 
-  Scanning tapes in and out is too time consuming. +  Scanning tapes in and out is too time consuming. 
-  There are discrepancies between what the offsite vendor's system has and TapeTrack.+  There are discrepancies between what the offsite vendor's system has and TapeTrack.
planning/introduction.1571263152.txt.gz · Last modified: 2025/01/21 22:07 (external edit)