TapeTrack Documentation

Because there is more to tape management than you ever realized

User Tools

Site Tools


primer:disaster_recovery

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
primer:disaster_recovery [2017/05/30 23:16] – [Disaster Recovery Key Performance Indicators] Gerard Nicolprimer:disaster_recovery [2025/01/21 22:07] (current) – external edit 127.0.0.1
Line 18: Line 18:
  
   * Identify all significant perceivable risks to the continuation of information systems.   * Identify all significant perceivable risks to the continuation of information systems.
-  * Develop a disaster recovery plan that takes into account the worst cases cenario while avoiding optimistic projections of favourable outcomes. +  * Develop a disaster recovery plan that takes into account the worst-case scenario while avoiding optimistic projections of favorable outcomes. 
-  * Develop a disaster recovery plan which includes an option to restore froms cratch (a Bare Metal Restore option). +  * Develop a disaster recovery plan which includes an option to restore from scratch (a Bare Metal Restore option). 
-  * Pre-identify all tapes that would be required to restore each and all systems,including key catalog backups.   +  * Pre-identify all tapes that would be required to restore each and all systems, including key catalog backups.   
-  * Set a realistic recovery time objective and recovery point objective.Test the plan regularly using staff who are unfamiliar with the process(excluding staff who are familiar with, or who have been involved with the creation of the Disaster Recovery Plan) to ensure that they can follow the documented recovery plan.+  * Set a realistic recovery time objective and recovery point objective. Test the plan regularly using staff who are unfamiliar with the process (excluding staff who are familiar with, or who have been involved with the creation of the Disaster Recovery Plan) to ensure that they can follow the documented recovery plan.
   * Perform both planned and snap disaster recovery tests.   * Perform both planned and snap disaster recovery tests.
  
Line 30: Line 30:
   * Diversity of staff able to follow the Disaster Recovery Plan.   * Diversity of staff able to follow the Disaster Recovery Plan.
   * Number of times the most recent recovery point is not available for restore.   * Number of times the most recent recovery point is not available for restore.
-  * Number of recovery point that would be available should they be required.+  * Number of recovery points that would be available should they be required.
  
-<-  primer:introduction|Introduction ^ primer:introduction|Introduction ^ primer:quality_control|Quality Control page ->+<-  primer:library_management|Library Management ^ primer:introduction|Introduction ^ primer:quality_control|Quality Control ->
primer/disaster_recovery.1496186170.txt.gz · Last modified: 2025/01/21 22:07 (external edit)