===== Method 1 - Last Volumes To First Empty Slots===== | ===== Method 1 - Last Volumes To First Empty Slots===== | ||
- | The fastest method to compact the Volumes in the racking slots is to move Volumes from end of Slots to fill gaps. | + | The fastest method to compact the Volumes in the racking slots is to move Volumes from end of Slots to fill gaps, or highest Slot numbers to Lowest Slot number gaps until all gaps are filled. |
{{method_1_1.png}} | {{method_1_1.png}} | ||
Line 44: | Line 44: | ||
This file is then loaded into TapeMaster with the first entry being assigned to Slot one, the second entry to Slot 2 etc. | This file is then loaded into TapeMaster with the first entry being assigned to Slot one, the second entry to Slot 2 etc. | ||
- | ===== Method 3 ===== | + | ===== Method 3 - Record Each Volume-ID And Slot Allocation |
Volumes are left in their current Slots and each Volume-ID is recorded in a Excel spreadsheet, | Volumes are left in their current Slots and each Volume-ID is recorded in a Excel spreadsheet, | ||
Line 53: | Line 53: | ||
{{excel_slot_numbers.png}} | {{excel_slot_numbers.png}} | ||
+ | |||
+ | ===== See Also ===== | ||
+ | |||
+ | [[technote: | ||
+ | [[technote: | ||
+ | [[technote: | ||
+ | |||