| |
planning:introduction [2019/10/16 21:58] – [Identifying Tape Management Objectives] Scott Cunliffe | planning:introduction [2025/01/21 22:07] (current) – external edit 127.0.0.1 |
---|
Examples of the kind of disagreements that might arise are: | Examples of the kind of disagreements that might arise are: |
| |
- The level of integration and automation that is implemented. | * The level of integration and automation that is implemented. |
- Who is responsible for supporting TapeTrack. | * Who is responsible for supporting TapeTrack. |
- What level of alerting is enabled within TapeTrack. | * What level of alerting is enabled within TapeTrack. |
| |
<note tip>Create a document that outlines what you will setup and deploy TapeTrack, ensure each stake-holder receives a copy, and ask for feedback before moving towards implementation.</note> | <note tip>Create a document that outlines what you will setup and deploy TapeTrack, ensure each stake-holder receives a copy, and ask for feedback before moving towards implementation.</note> |
These objections can include: | These objections can include: |
| |
- Why did we have to change from our old system? | * Why did we have to change from our old system? |
- Why is maintaining the old system no longer part of my duties? | * Why is maintaining the old system no longer part of my duties? |
- I did not attend the training and I don't know how the system works. | * I did not attend the training and I don't know how the system works. |
- The system is not the same as our old system. | * The system is not the same as our old system. |
- Why am I getting messages notifying me that I have made a mistake? | * Why am I getting messages notifying me that I have made a mistake? |
- Scanning tapes in and out is too time consuming. | * Scanning tapes in and out is too time consuming. |
- There are discrepancies between what the offsite vendor's system has and TapeTrack. | * There are discrepancies between what the offsite vendor's system has and TapeTrack. |